USDM at the research site

USDM was created so that a study design can move between a sponsor’s systems without being retyped. The place a study is actually carried out is the research site, and most sites still receive the protocol as a PDF. This page looks at USDM from that end: what it gives a site, and what a site still has to build.

What a USDM study definition gives a site

If a site receives a study as USDM instead of, or alongside, the PDF, a good deal of what a coordinator currently reads out of the document arrives already structured.

The visit schedule

Every planned visit, the epoch it falls in, its planned day and its window, as data instead of a table to be read.

What happens at each visit

The activities scheduled at each visit, and where the sponsor has supplied biomedical concepts, the individual values each activity collects.

Eligibility criteria

Each inclusion and exclusion criterion as its own numbered item.

Arms and interventions

The arms, what is given in each, and the dose, route and frequency.

Objectives and endpoints

What the study is measuring and at which level.

Amendments

A new study version for each amendment, with a summary of what changed and why.

That is real progress. A schedule of activities that does not have to be interpreted is a schedule that two sites cannot interpret differently.

What a site still has to build

A study definition is the sponsor’s plan. Running it is a different body of work, and it is specific to each site. None of the following is in a USDM file, and none of it is meant to be.

  1. Source documents and visit worksheets

    The pages a coordinator fills in at each visit, in the site's own templates and to the site's own conventions. The schedule says what is required; the worksheet is how the site records that it was done.

  2. The study in the site's systems

    The visit calendar and milestones in the site's trial management system, and where the site builds its own data capture, the forms and events there.

  3. Coverage analysis and the budget

    Which items at which visits are billed to the study and which are routine care. That depends on the site, its payers and its standard of care, so it cannot come from the sponsor's design.

  4. Operational detail the design leaves to the site

    Who performs each activity, in what order on the day, with which local equipment and vendors, and how the protocol's conditions and footnotes translate into instructions a coordinator can follow.

  5. All of it again, at every amendment

    When the protocol changes, each of these has to be found and updated. USDM records that an amendment happened and why. Working out what it changes in a site's own documents is still the site's job.

One site, many sponsors

A sponsor chooses its own systems and can make them agree with each other. A site does not have that position. It runs studies from many sponsors at once, each with its own EDC and its own way of presenting a protocol, while the site’s own tools for calendars, regulatory documents, source and billing are the same across all of them.

So the site’s question is not whether a given study arrives as USDM. It is how to get from whatever arrives, PDF or data, to the documents and configuration its staff work from, in the same way every time. As more sponsors author protocols digitally, more studies will have a structured definition upstream. The work of turning a definition into a site’s operating documents stays where it is.

Where the CTPM fits

Concordare’s Clinical Trial Protocol Model (CTPM) is a digital protocol built for that work. Apta, the conversion engine, extracts it from the protocol PDF. The study team reviews and approves it. Structura and Porta then generate the site’s source documents, EDC build and CTMS configuration from it, and regenerate them when the protocol is amended.

AspectUSDMCTPM
What it isAn open CDISC standard for the study definition.Concordare's digital clinical trial protocol.
Built forPassing a study design between sponsor, CRO and vendor systems.Generating what a research site needs to run the study.
Starts fromA study authored in, or converted into, a tool that writes USDM.The protocol PDF the site already receives, converted by Apta, or a USDM file from the sponsor. Approved by the study team either way.
ProducesA file other systems can read.Source documents, EDC builds and CTMS configuration, regenerated when the protocol is amended.
RelationshipThe common language for the study design.Reads and writes USDM 4.0 through Concordare's connector, and carries operational detail USDM does not define.

The two are not alternatives. A standard for exchanging the design and a model for running it at the site answer different questions, and a study can use both.

USDM in, USDM out

Concordare has built a CDISC USDM 4.0 connector for the CTPM, and it works in both directions.

Import

A USDM file seeds the CTPM

A sponsor that authors its protocol digitally can send a site the USDM file. Concordare reads it and seeds a draft CTPM with the design it carries: arms, epochs, visits, activities, the schedule and its timings, objectives, endpoints, eligibility criteria and interventions. The study team reviews and approves that draft exactly as it would one extracted from a PDF, and nothing is generated until it has.

Export

The CTPM writes a USDM file

An approved CTPM can be written out as a USDM 4.0 JSON file, with coded values in CDISC controlled terminology wherever the standard fixes the vocabulary. A study that reached a site as a PDF can be handed on to any tool that reads USDM.

Files from real tools drift from the standard, so references are checked before they are followed, and every import and export comes with a report of what was carried across and what was not.

USDM does not carry a site's operational detail, so that part still comes from the protocol document and the study team's review. What changes is that nobody retypes the schedule of activities.

If you are a site: what to ask

  • Does the sponsor hold this study as structured data, and can the site have it?
  • Which version of USDM, and does it include biomedical concepts, or only the schedule?
  • When the protocol is amended, will the site get a new file as well as a new PDF?
  • What will the site still need to produce itself, and how long does that take today?

Keep going